08-19/2025
Install the blocked ring die on the machine, mix 100-200kg pellet (diameter of the pellet should be same as ring die hole diameter. For example, 2mm die uses 2mm pellet) with 3-5% water and 4%-5% oil evenly. Flush the hole channel for 10-20 minutes. After all blocked channels are cleaned, we can start normal production.